Tuesday, October 15, 2024

Music Video Progress




I have fully edited my music video and begun to put animation in. I am at the point where all I need to edit is the colour grading of all the shots, properly configure the ending and adjust some of the animated aspects.






 

Monday, October 14, 2024

Website Progress

I have begun the map out the layout and house style of my website and drafting each section on the homepages. However, there is still much and progress to be made before my first draft is complete.














Thursday, July 18, 2024

Prelude (500 DOS intertextuality Scene)


Plan:
  • Location: I have a friend who lives in an apartment block so hopefully we can use the lift in her flat to film this segment
  • Actors: Zahra + Ruby
  • Props: Pair of headphones
  • Costume: Normal clothes (not trying to replicate the 500 DOS outfits)


Wednesday, July 17, 2024

Bedroom Scene

Filming plans



Photo plans:


Intertextual background references:

  • Before Sunrise poster
  • 500 DOS poster
  • Haven CD in background
  • R+J DVD
  • Post-it notes

Thursday, July 11, 2024

Photoshoot Contact Sheet


 Working Pictures:

First 7 pics- White background, serious code of expression, good lighting

Piper Headshot Black Background- plain background, central framing, nice headshot

Brick Head Shot- well lit shot, no noticeable shadows


Problems:

Portrait Mic Shot- too bright, shadows are distracting

Outside shots- location in background

Piper Portrait Mid Shot- too bright lighting

Wednesday, July 3, 2024

Love/Romance Montage

 Filming Plans:






Vid Planning (Performance)

Plans for beginning production:

Shot List:

  • Wide shot of whole band performing
  • Close ups of Zahra singing
  • Close ups of Millie drumming
  • Close ups of Mary guitar playing
  • Dynamic shots of performance (moving the camera around whilst they are playing)
  • Extreme close ups of instruments, mouths singing, hands on instruments etc.

Screen captures from rock videos for performance references: